Vacuum Drying and Oil Filling Equipment Installation & Commissioning Project
Case Studies

Vacuum Drying and Oil Filling Equipment Installation & Commissioning Project

2026-05-23

• Project Name: Vacuum Drying and Oil Filling Equipment Installation & Commissioning Project

• Project No. / ID: STI-IC-KSA2022001

• Client / Owner:​ MATCO - Mohammed Salem Saleh Al-Ojaimi Factory for Industry

• Location / Site Address:​ Al-Ojaimi Industrial Area, Riyadh, Kingdom Of Saudi Arabia

• Project Duration: 40 days

• Equipment Summary List:

Equipment Name: Vacuum Drying and Oil Filling Equipment

Model / Specification: 8*4*3

Quantity: 1 Set

Manufacturer: TRIHOPE